SH 1203

Mobile final screen

Maximum screening performance in a handy format

Maskin Mekano is the Swedish market leader in mobile precision screening. Our STE screen uniquely combines high capacity and high quality of the produced material. Letting the final screen be a bottleneck in your plant is both unnecessary and expensive. A high performing final screen is the key to a profitable end product.

The SH 1203 is a mobile three-deck final screening station particularly well suited for producing paving materials, or for sorting other fractions where the demands on capacity and sharp screening curves are high. When you need to screen out really fine material. Or when the material is damp or sticky. The aggressive stroke of the STE screen prevents clogging and gets the fines through in cases where many other screens would fall short.

The high jacking legs facilitate keeping the area around the machine clean and tidy. The compact format makes it easy to place the SH 1203 exactly where you need to sharpen your screening results. In addition, the SH 1203 is packed with user-friendly and safe solutions to make the working environment for operators smoother and less risky.

The low energy consumption makes the investment both economical and climate-smart.

Specifikation

  • Transport Length:    9,5 m
  • Transport Width:    3.0 m
  • Transport Height:    3.2 m
  • Machine Weight:    approx. 18 tonnes

Options

    • Lighting
    • Centralized lubrication
    • Dustreduction fines conveyor
    • Extra belt cleaner on fines conveyor

    Side conveyors

    • Chevron belt high
    • Chevron belt low
    • Adjustable belt speed oversize conveyor
    • Rubber skirts side conveyors (price per unit)

    Screen

    • Ball deck on lower deck
    • Rubber skirts between feeding conveyor and screen
Deck
siktdäck 3

3 deck

Screen area
Diagram of the EC03 screen area with dimensions 1.2 x 2.2 meters for optimal sorting capacity

1,4 x 4,8 m

Weight
Graphic indicating the EC03 screening plant's total weight of 12,000 kilograms

21.000

Transport

Trailer optimized

On mains
Symbol for EC03's energy efficiency, requiring only 12 kWh on mains operation

20 kW

Set-up time
Hourglass symbolising the EC03's quick setup time of only 3 minutes.

10 min

Watch videos

Schematics: SH 1203

Advantages of Maskin Mekano Products

Climate Footprint

Electric Drive OR Low Emissions

Vibration-Free

Vibroblock Concept

Screening Performance

Aggressive Impact

Safety

Protection According to Regulations

Overview

Touchscreen

Noise Level

Low

Manufacturing

In Sweden

Would you like more information about SH 1203or maybe a quote, or leasing options?